There is no known route history.
7+ | Assigned grade |
7+ | Nicky |
Re-bolting and addition of bolts to existing routes are problematic. The current protection is aligned with the placements the first climbers and route setters used originally. Therefore a lot of the first bolts are very high and a fall may cause serious injuries.
It is rumoured that there were attempts to improve protection but the bolts were removed by the old school climbers.
So either be brave and strong or use easier routes to set up a top rope. Alternatively use a clipstick for the first bolt, but have in mind that it is toprope!
Please don't toprope directly in the quicklinks/fixed carabiners, use your own material and only do the final lowering directly through the bolt/quicklink/fixed carabiner.
Get a detailed insight with a timeline showing
Login to see the timeline!