Help

Batu Kurau

Access: COVID-19: Lockdown

Malaysia has ordered a national lockdown from March 18.

See warning details and discuss

Created 6 months ago

Seasonality

J
F
M
A
M
J
J
A
S
O
N
D

Summary

This lime stone crack was established in 2016 by the local climbing community.

Approach

Drive from Batu Kurau into the south direction. After around 6km you will reach a small bridge with a food stall on the right hand side.

Cars can be parked on the street side opposite the Road side wall.

History

View historical timeline

The local climbing community established this crag in 2016 with gear support from Camp5, Verticale, Bolder Ventures, Riverfront Chalet, Akmal Noor, Chaer, Pak Ngah, Pak Non, Najib Tahir, Persatuan Mendaki Malaysia, Persatuan Mendaki Taiping and the Malaysian Bolting Fund

Areas

Add area(s) Add topo Reorder Bulk edit
Name
Style
Routes
Ticks
Height
Grades
Road Side A Sector
5
25
13m
1
Road Side B Sector
5
12
12m
1
River Side Sector
8
11
18m
3

Information needed

This crag does not have a description. Can you share a summary introduction to this crag?

If you can help provide a better quality resource for the climbing community then please click 'edit this crag' button near the top of the page.

Activity

Check out what is happening in Batu Kurau.

Deutsch English Español Français Italiano 한국어 中文