Min:
Max:
Min:
Max:
Min:
Max:
Min:
Max:
Min:
Max:
Min:
Max:
Min:
Max:
Min:
Max:
Min:
Max:
Min:
Max:
Min:
Max:
Min:
Max:
Min:
Max:
Min:
Max:
Min:
Max:
Min:
Max:
Min:
Max:
Min:
Max:
Min:
Max:
Min:
Max:
Min:
Max:
Min:
Max:
Min:
Max:
Min:
Max:
Min:
Max:
Min:
Max:
Min:
Max:
Min:
Max:
Min:
Max:
Min:
Max:
Min:
Max:
Min:
Max:
Did all the moves (with lots of falls) to the last bolt, and I think I could link this much on lead within a sesh or two...
But I never made any upwards progress in the 1.5m from the last bolt to the anchor, and didn't really have an idea for how to do it at the grade.